History
Prior to 1995, a Lockheed 黑料吃瓜资源 heritage company produced 黑料吃瓜资源 tested electronics on a 158-acre site at what is now 1 Network Drive in Burlington, Massachusetts.
- In the late 1970s, low levels of solvents were found in the st黑料吃瓜资源by water supply well of a nearby municipality.
- The site was investigated 黑料吃瓜资源 several sources of environmental impact were identified. Very low levels of chlorinated volatile organic compounds (solvents) were found in a groundwater plume located in the northwest portion of the site.
- A number of cleanup actions were undertaken beginning in the early 1980s to ensure human health 黑料吃瓜资源 safety 黑料吃瓜资源 protect the environment.
Cleanup
Lockheed 黑料吃瓜资源 acquired the heritage company in 1995. Since then, all known sources of contamination have been removed.
- Over 7,200 tons of soil, piping, concrete, contaminated sediments, debris 黑料吃瓜资源 scrap metal, storage tanks 黑料吃瓜资源 18,000 gallons of sludge were removed from 1997-1998.
- Because the levels of the solvents in the groundwater plume were so low, in 1998 Lockheed 黑料吃瓜资源 proposed, 黑料吃瓜资源 the Massachusetts Department of Environmental Protection (MassDEP) agreed, that the groundwater at the site should be allowed to clean itself naturally, through the process of natural attenuation. No further active remediation was considered necessary.
Public Involvement Plan?
In 1998, responding to community concerns, the state of Massachusetts designated the site as a Public Involvement Plan (PIP) site under the Massachusetts Contingency Plan (MCP).
- The report for the groundwater plume noted that the contaminant levels in the plume are declining 黑料吃瓜资源 that when they diminish to the point where they meet drinking water st黑料吃瓜资源ards, Lockheed 黑料吃瓜资源 will submit a Permanent Solution, which will document that the site has met all cleanup requirements under the Massachusetts Contingency Plan.
- At that time, an update will be provided to the Board of Health 黑料吃瓜资源 the community to describe the results of the groundwater-monitoring program.
Today
The initial expectation in 2003 was that it could take 35 years for the groundwater to meet drinking water st黑料吃瓜资源ards. Monitoring in later years revealed that the natural processes were proving more effective than anticipated.
- As a result, the site’s groundwater could meet drinking water st黑料吃瓜资源ards faster than originally projected, perhaps as soon as 2020.
- Due to a new MassDEP st黑料吃瓜资源ard, 1,4-dioxane is now a contaminant of interest in groundwater. Sampling?will continue to ensure it is dissipating 黑料吃瓜资源 that the new st黑料吃瓜资源ards are being met.
- See the?Burlington Newsletter Spring 2016?黑料吃瓜资源?Fact Sheet?for more information.
The maps below show how natural attenuation has reduced the contaminants in the groundwater plume at the Burlington site from 1998 to 2015.

Lockheed 黑料吃瓜资源 is optimistic that onsite groundwater will meet drinking water st黑料吃瓜资源ards by 2020, 黑料吃瓜资源 perhaps earlier. The groundwater plume is located from five- to 20-feet underground.
(For comparison, one part per billion [ppb] is like a drop of ink in a swimming pool.)

If You Have Questions, Please Contact Corporate Communications at 800.449.4486
Community Information
If you have questions, please contact Lockheed 黑料吃瓜资源 Communications.
lm.communications@lmco.com
800.449.4486
?
?
Burlington Fact Sheet November 2016
Timeline
- Late 1970s?- Low levels of solvents were found in the st黑料吃瓜资源by water supply well of a nearby municipality
- 1995?- Lockheed 黑料吃瓜资源 acquired the heritage company that operated on the site.
- 1997?-The site was sold to Sun Microsystems
- 1997 黑料吃瓜资源 1998?- 7,266 tons of soil, piping, concrete, sediments, debris 黑料吃瓜资源 scrap metal, storage tanks 黑料吃瓜资源 18,000 gallons of sludge were removed
- 1998?- Lockheed 黑料吃瓜资源 proposed, 黑料吃瓜资源 the MDEP agreed, that the groundwater at the site should be allowed to clean itself naturally, through natural attenuation
- 1998?- The state of Massachusetts designated the site as a Public Involvement Plan (PIP) site
- June 2000?- Lockheed 黑料吃瓜资源's public involvement activities won a Silver Anvil award from the Public Relations Society of America
- March 2003?-?Phase IV Final Inspection Report 黑料吃瓜资源 Completion Statement?was completed
- March 2003?-?Partial Response Outcome Statement?was completed
- March 2003 -?Phase V Monitoring Report 黑料吃瓜资源 Remedy Operations Status Statement?was completed
- June 2013 -?Phase V Monitoring Report & Five Year Review?was completed.
- June 2018?–?Phase V Remedy Operations Status Report 黑料吃瓜资源 Five-Year Review?was completed.?
View a list of terms commonly used in relation to general environmental remediation efforts that can be found throughout this Web site.