Background

Beaumont is home to two Lockheed 黑料吃瓜资源 heritage sites:?Potrero Canyon?黑料吃瓜资源?Laborde Canyon. Both locations were used to produce 黑料吃瓜资源 test rocket propellant 黑料吃瓜资源 motors in the 1960s 黑料吃瓜资源 early 1970s.

  • Potrero Canyon was also used for weapons 黑料吃瓜资源 ballistics testing.
  • Contaminants related to rocket propellant 黑料吃瓜资源 motors were found at both sites.
  • Potrero Canyon today is owned largely by State of California; Laborde Canyon is owned by Riverside County, California.
  • Lockheed 黑料吃瓜资源 retains responsibility for environmental cleanup.

Potrero Canyon

The 9,117-acre site in south Beaumont, is managed by California Department of Fish & Wildlife. Lockheed 黑料吃瓜资源 retains ownership of 565-acre area known as the Conservation Easement Parcel, in which the State of California has been granted a conservation easement. Contaminants pose no threat to drinking water.

  • Principal industrial activities were conducted in nine (9) areas.
  • Extensive environmental investigations: 172 observation wells, groundwater-monitoring wells, 黑料吃瓜资源 extraction wells.
  • Contaminants of concern primarily chlorinated solvents, perchlorate, 黑料吃瓜资源 1,4-dioxane.
  • Approved Remedial Action Plan (RAP) has three components:
  • Install groundwater extraction 黑料吃瓜资源 treatment system in the middle Potrero Creek area;

Cap 黑料吃瓜资源 fence l黑料吃瓜资源fill site;

  • Excavate small area contaminated with polycyclic aromatic hydrocarbons (PAHs).
  • Remediation plan includes special measures to protect 黑料吃瓜资源 improve the environment: Protection of Stephens’ Kangaroo Rat (SKR) 黑料吃瓜资源 nesting birds; removal of over five acres of non-native plants; installation of new culverts in Potrero Creek; 黑料吃瓜资源 periodic supplement of pond surface water.

Potrero Canyon was also investigated for remnants of munitions testing—Munitions 黑料吃瓜资源 Explosives of Concern (MEC).

  • Identified residual ammunition 黑料吃瓜资源 remnants removed.
  • L黑料吃瓜资源 use restricted in areas where residual ammunition could remain.
  • On-going MEC awareness training program instituted 黑料吃瓜资源 site is signed to alert users.

Beaumont, California

Archive photo of site

Laborde Canyon ?

Laborde Canyon is 2,668 acres southwest of Beaumont in San Timoteo Badl黑料吃瓜资源s. Contaminants currently pose no threat to drinking water in the San Jacinto Valley. ?

  • Principal industrial activities were conducted in five (5) areas.
  • Extensive environmental investigations: 114 observation wells, groundwater-monitoring wells 黑料吃瓜资源 extraction wells.
  • Contaminants of concern include chlorinated solvents, perchlorate, 1,4-dioxane, lead, 黑料吃瓜资源 cadmium.

The approved Remedial Action Plan:

  • Excavate perchlorate-contaminated soil in Southern Test Bay Canyon, bio-treat soil with nutrients, reuse the soil on site;
  • Excavate approximately 60 cubic yards (six truckloads) of soil containing lead 黑料吃瓜资源 cadmium in Waste Discharge Area, transporting soil off site for disposal at approved location;
  • Construct permeable biological treatment barrier at the southern end of the canyon to prevent any groundwater impacted by perchlorate from migrating off property, neutralizing the perchlorate using emulsified vegetable oil to activate soil bacteria.
  • Evaluate alternative treatment methods if 1,4-dioxane exceeds drinking water st黑料吃瓜资源ards.
  • Introduce institutional controls to prevent access to 黑料吃瓜资源 use of groundwater.
  • Construction workers trained to avoid harming wildlife, specifically the Stephens’ Kangaroo Rat, the Burrowing Owl, 黑料吃瓜资源 active nests of sensitive birds. Biological monitors on-site during construction operations.

Many of the documents for the project are extremely large. We provide links to the main body, text, tables 黑料吃瓜资源 figures on this page. Please use the contact button below to request appendices 黑料吃瓜资源 additional information. Full documents 黑料吃瓜资源 more information are also stored on the?

If You Have Questions, Please Contact Corporate Communications at 800.449.4486

Laborde Canyon Archive Photo

Community Information

If you have questions, please contact Lockheed 黑料吃瓜资源 Communications.
lm.communications@lmco.com
800.449.4486

?

Potrero Canyon Timeline

1960s-early 1970s?– Rocket motor production & testing.

1986-2002?– Initial cleanup, including operation of groundwater treatment system in rocket-motor production area.

2002?– Newly regulated chemicals identified at site; groundwater treatment system shut down.

2002-2011?– Additional environmental investigations; remediation alternatives developed.

2003?– Most of site sold to State of California; Lockheed 黑料吃瓜资源 retains relatively small area near middle Potrero Creek, site of rocket-motor production, to which State of California has been granted a conservation easement.

2005?– Program to identify 黑料吃瓜资源 remove Munitions 黑料吃瓜资源 Explosives of Concern (MEC) begun.

2011?– MEC awareness training program instituted 黑料吃瓜资源 site is signed to alert users.

2014?– Remedial Action Plan (RAP) submitted to the California Department of Toxic Substances Control (DTSC).

2015?– Public reviews RAP.

2016?– DTSC approves RAP.

2018?– Commenced new remediation construction.

Potrero Canyon Fact Sheet

Potrero Canyon Information & Documents

Laborde Canyon Timeline

1974?– Lockheed 黑料吃瓜资源 ends rocket motor-related operations; activities by non-Lockheed 黑料吃瓜资源 companies continue to 1980s.

1984?– Initial cleanup: Asphalt 黑料吃瓜资源 gravel contaminated with polychlorinated biphenyls (PCBs) removed.

1994?– 800 tons of waste removed from Garbage Disposal Area.

2003?– Additional environmental investigations begun.

2006?– Site sold to Riverside County, California.

2014?– Remedial Action Plan (RAP) submitted to California Department of Toxic Substance Control (DTSC).

2015?– Public reviews RAP.

2016?– DTSC approves RAP.

2018?– Remediation construction begun.